Mavro Spithari, Boeotia (21MW)



Project Description
Mavro Spithari is a wind farm belonging to the company “Aioliki Spithari S.A.” The capacity of the project is 21 MW (maximum) and 22.5 MW (installed), consisting of five (5) wind turbines (WTGs) of 4.5 MW capacity each, type V136 of Vestas Manufacturer . The project is located in the region of Plataies, in the Municipality of Thebes, in the Prefecture of Boeotia. Mavro Spithari will be connected to a new 33/400 kV High Voltage (HV) Substation, currently under construction in the region of Chouni, in Levadia in Boeotia Prefecture. Currently, the project is in the phase of completing the internal building works with an estimation to be commissioned in Q2 2025, which will result in the completion of the connection works with Mavro Spithari between April and May 2025.